The BTC pipeline project cost an estimated $3.7 billion, with BP as operator. The pipeline was officially inaugurated at the Sangachal terminal, near Baku, by President Ilham Aliyev of the Azerbaijan Republic, President Mikhail Saakashvilli of Georgia and President Ahmet Sezer of Turkey, joined by President Nursaltan Nazarbayev of Kazakhstan on 25 May 2005.
UPDATES from the Ministry of Foreign Affairs of Georgia.
No comments:
Post a Comment